Refineries & Petrochemicals

Abu Dhabi Polymers Company Limited (Borouge)

TSJ Limited (Joint Venture of Tecnimont and Samsung Engineering) Fabrication and Erection of CS and SS Piping works at P3B Site, Borouge III, Ruwais, Abu Dhabi, UAE with Larsen & Toubro Limited (HCP Division) with best in the industry.

Period From: Oct 2011 to Feb 2015
Job Value: AED 12 Million


Ongoing Projects

Power and Boiler

NTPC Nabinagar STPS Stage-II — Unit #6 BTG

Coal Bunker; Boiler Structures; Ceiling Girder; Pressure Parts; Integral Piping; Nonpressure Parts

Client / EPC: L&T Energy– CarbonLite Solutions
Capacity / Scale: 3 × 800 MW
Period: Sep 2025–Till Date

Steel & Metallurgical

Rourkela Steel Plant- Civil and warehouse Building Structure at 3 MTPA Hot Strip Mill for SAIL RSP Rourkela Steel Plant, Rourkela, Odisha

TSJ Limited (Joint Venture of Tecnimont and Samsung Engineering) Fabrication and Erection of CS and SS Piping works at P3B Site, Borouge III, Ruwais, Abu Dhabi, UAE with Larsen & Toubro Limited (HCP Division) with best in the industry.

Client: Larsen & Toubro Ltd HCPLarsen & Toubro Ltd HCP
Job Type: Mechanical

Completed Projects

Thermal & Hydro Power Sation


NTPC Tanda Stage-II— Unit #5 Boiler

Complete structure, pressure parts & piping

Client / EPC: L&T Power
Capacity / Scale: 2 × 660 MW
Period: Apr 2016–May 2019



Mahagenco Koradi TPS Expansion 

Pressure parts & critical piping 

Client / EPC: L&T Power
Capacity / Scale: 3 × 660 MW 
Period: 2012–2014 



JP Nigrie TPS 

Boiler structure / structure & pressure / parts / mechanical erection

Client / EPC: L&T Power
Capacity / Scale: 2 × 660 MW 
Period: 2011–2014 


Vedanta / SEPCO TPS, Jharsuguda 

Structure & pressure parts

Client / EPC: L&T / SEPCO 
Capacity / Scale: 4 × 600 MW 
Period: 2007–2011 



Nabha TPS, Rajpura  

Critical piping & mechanical erection 

Client / EPC: L&T Power 
Capacity / Scale: 2 × 700 MW 
Period: 2013–2015 



DVC Koderma  

TG structure & ducting 

Client / EPC: L&T Power 
Capacity / Scale: 2 × 500 MW 
Period: 2009–2012 

Refineries & Petrochemicals


HRRL Pachpadra Refinery, Barmer, Rajasthan

Various process piping works 

Client / EPC: L&T Hydrocarbon Engineering
Period: Nov 2022–Till Date 


RIL Dahej Vinyl Project, Gujarat

Structure fabrication & erection; equipment erection; piping fabrication & erection

Client / EPC: L&T Hydrocarbon Engineering
Period: Jun 2026–Till Date 


Reliance J3 Refinery, Jamnagar, Gujarat 

Structural & piping fabrication/erection + underground
fire-fighting pipe laying

Client / EPC: L&T HCP
Period: Apr 2014–Mar 2016 


Reliance Bharuch Refinery / Dahej, PTA-5 

Piping fabrication & erection 

Client / EPC: L&T HCP
Period: 2013–2014 


IOCL Panipat Refinery Expansion —NaphthaToyo Plant

Fabrication & erection works 

Client / EPC: L&T
Period: Jun 2008–Oct 2009 


Borouge III, Ruwais, Abu Dhabi, UAE

Complete process piping with supports through hydrotesting/box-up

Client / EPC: Borouge / TSJ JV / L&T HCP
Period: Oct 2011–Jan 2015 
Value: AED 12 Million

Steel & Metallurgical


SAIL RSP, Rourkela — 3 MTPA Hot Strip Mill 

Civil & warehouse building structural works 

Client / EPC: L&T MMH
Period: Feb 2017–Sep 2018 


SAIL Bhilai — Sinter Plant III 

Sinter plant erection; conveyor belt erection; blast furnace erection

Client / EPC: L&T MMH
Period: Mar 2012–Oct 2013 


Rourkela Steel Plant —Blast Furnace #5 Stock House

Erection & alignment of stock house

Client / EPC: McNally Bharat 
Period: May 2012–Dec 2012 


Bhushan Steel Plant, Angul 

Fabrication, erection & blast-furnace piping works

Client / EPC: L&T
Period: Jun 2011–May 2013 


Rourkela Steel Plant — Smelter Plant 

Smelter plant erection 

Client / EPC: L&T
Period: Sep 2010–Sep 2011 


Utkal Aluminium Refinery, Rayagada 

Structural steel fabrication

Client / EPC: L&T MMH
Period: Nov 2009–Mar 2012 

Other Industral


NTPC Talcher FGD Project

Fabrication, assembly, erection, testing & commissioning of absorbers

Client / EPC: Artson Engineering / Tata Projects
Period: Sep 2020–Aug 2021 


NTPC Tanda Stage-II CHP Package 

Stacker reclaimer, crusher house, wagon tipplers, structures, conveyor belt & equipment

Client / EPC: L&T MMH
Period: Apr 2017–2018 


HURL Sindri 

AG piping fabrication & erection 

Client / EPC: L&T Hydrocarbon Engineering
Period: Oct 2019–Nov 2021 


Lapanga, Sambalpur — 6×150 MW CPP 

MPH structure, coal mill

Client / EPC: Aditya Birla / L&T 
Period: Sep 2011–Aug 2013 


PPN Chennai, Cuddalore 

ESP and ducting package 

Client / EPC: L&T Power 
Period: 2014–2016