Refineries & Petrochemicals
TSJ Limited (Joint Venture of Tecnimont and Samsung Engineering) Fabrication and Erection of CS and SS Piping works at P3B Site, Borouge III, Ruwais, Abu Dhabi, UAE with Larsen & Toubro Limited (HCP Division) with best in the industry.
Period From: Oct 2011 to Feb 2015
Job Value: AED 12 Million

Power and Boiler
Coal Bunker; Boiler Structures; Ceiling Girder; Pressure Parts; Integral Piping; Nonpressure Parts
Client / EPC: L&T Energy– CarbonLite Solutions
Capacity / Scale: 3 × 800 MW
Period: Sep 2025–Till Date

Steel & Metallurgical
TSJ Limited (Joint Venture of Tecnimont and Samsung Engineering) Fabrication and Erection of CS and SS Piping works at P3B Site, Borouge III, Ruwais, Abu Dhabi, UAE with Larsen & Toubro Limited (HCP Division) with best in the industry.
Client: Larsen & Toubro Ltd HCPLarsen & Toubro Ltd HCP
Job Type: Mechanical
Complete structure, pressure parts & piping
Client / EPC: L&T Power
Capacity / Scale: 2 × 660 MW
Period: Apr 2016–May 2019
Pressure parts & critical piping
Client / EPC: L&T Power
Capacity / Scale: 3 × 660 MW
Period: 2012–2014
Boiler structure / structure & pressure / parts / mechanical erection
Client / EPC: L&T Power
Capacity / Scale: 2 × 660 MW
Period: 2011–2014
Structure & pressure parts
Client / EPC: L&T / SEPCO
Capacity / Scale: 4 × 600 MW
Period: 2007–2011
Critical piping & mechanical erection
Client / EPC: L&T Power
Capacity / Scale: 2 × 700 MW
Period: 2013–2015
TG structure & ducting
Client / EPC: L&T Power
Capacity / Scale: 2 × 500 MW
Period: 2009–2012
Various process piping works
Client / EPC: L&T Hydrocarbon Engineering
Period: Nov 2022–Till Date
Structure fabrication & erection; equipment erection; piping fabrication & erection
Client / EPC: L&T Hydrocarbon Engineering
Period: Jun 2026–Till Date
Structural & piping fabrication/erection + underground
fire-fighting pipe laying
Client / EPC: L&T HCP
Period: Apr 2014–Mar 2016
Piping fabrication & erection
Client / EPC: L&T HCP
Period: 2013–2014
Fabrication & erection works
Client / EPC: L&T
Period: Jun 2008–Oct 2009
Complete process piping with supports through hydrotesting/box-up
Client / EPC: Borouge / TSJ JV / L&T HCP
Period: Oct 2011–Jan 2015
Value: AED 12 Million
Civil & warehouse building structural works
Client / EPC: L&T MMH
Period: Feb 2017–Sep 2018
Sinter plant erection; conveyor belt erection; blast furnace erection
Client / EPC: L&T MMH
Period: Mar 2012–Oct 2013
Erection & alignment of stock house
Client / EPC: McNally Bharat
Period: May 2012–Dec 2012
Fabrication, erection & blast-furnace piping works
Client / EPC: L&T
Period: Jun 2011–May 2013
Smelter plant erection
Client / EPC: L&T
Period: Sep 2010–Sep 2011
Structural steel fabrication
Client / EPC: L&T MMH
Period: Nov 2009–Mar 2012
Fabrication, assembly, erection, testing & commissioning of absorbers
Client / EPC: Artson Engineering / Tata Projects
Period: Sep 2020–Aug 2021
Stacker reclaimer, crusher house, wagon tipplers, structures, conveyor belt & equipment
Client / EPC: L&T MMH
Period: Apr 2017–2018
AG piping fabrication & erection
Client / EPC: L&T Hydrocarbon Engineering
Period: Oct 2019–Nov 2021
MPH structure, coal mill
Client / EPC: Aditya Birla / L&T
Period: Sep 2011–Aug 2013
ESP and ducting package
Client / EPC: L&T Power
Period: 2014–2016